August 25, 2003

Aug 25 Update

New Feature: On selected photos, look for the "green i" info icon info icon. Clicking on the icon will take you to an annotated version of the current photo, describing building numbers, directions, and other features. View a sample.

Although no buildings have come crashing down, the last week was filled with progress on many "little" things. The north tunnel was filled and graded, many truckloads of dirt were hauled away, and power and tubing lines were connected to a new central container/building. Here are a few pictures. View the slide show or examine individual pictures below:

Click on a picture to see a larger image:


Another load of dirt to fill the tunnel.
(18-Aug-2003)


North tunnel has been filled and smoothed over.
(20-Aug-2003)


Trucks lined up to haul away contaminated soil.
(21-Aug-2003)


Worker installing power lines.
(21-Aug-2003)


Looking SW at Lakewood and Carson.
(23-Aug-2003)


Power poles, plastic tubing, and an orange fence.
(23-Aug-2003)